info@ellison.uk.com

Ellison Engineering Package Plant Room

The Best Packaged Plant Room Choice.

Ellison Engineering Services (UK) Limited

incorporated in 1995 as a specialist company manufacturing containerised and packaged plantrooms, the natural progression of some twenty eight years experience within the building services industry. Following the 2003 acquisition of competitor AC Engineering Services a company rebrand process took place with the company named EllisonAC Limited.

Plant Room

Packaged Plantroom.

switch Room

Switchgear Room.

Tank Room

Heavy Duty tank Rooms.

Enclosures

Switchgear Enclosures.

About Our Company

The independently family owned company operates from a purpose built specialist manufacturing facility at its headquarters in Morecambe, Lancashire. Development of Packaged products led to the company patenting a fully vented acoustic ridge section and cladding fixing systems, both of which enhance our products by ensuring heat build up is kept to a minimum and that the aesthetic appearance of our units is as neat as possible, yet at the same time being extremely robust.

Client Testimonials

“We can't thank the Ellison team so much. From the initial enquiry right to the fitting and commisioning of our plant room was a breeze. We have also had fantastic support.”
Peter Andrews.
“We had a problem with our switch room and contacted Ellisons and they made plans and recommendations for the swap out, Highly recommended, absolutely seamless.”
John Scott
"We needed office container for our Northern Site, Ellisons built and fitted our container with office and server spaces and dining area. Thank you for the fantastic experience.”
Pauline Jackson

Contact Us Today.

“Our facility enables all aspects of containerised plantroom manufacture, including steel fabrication, class 1 pipe welding, cladding panel manufacture, pipework thermal insulation & electrical to take place in-house, ensuring our company has full control of each project from initial design into production and through to escorting the delivery to site.”